Line BD

Ordering number:
8595090558217
lightning current arrester for telecommunication and signalling lines, installation at the entry into building, max. 70 V
Ordering number:
8595090555506
lightning current arrester for two 2-core telecommunication and signalling lines, installation at the entry into building, max. 70 V, pluggable module
Ordering number:
8595090555544
lightning current arrester for two 2-core telecommunication and signalling lines, installation at the entry into building, max. 70 V, pluggable...
Ordering number:
8595090558224
lightning current arrester for telecommunication and signalling lines, installation at the entry into building, max. 180 V
Ordering number:
8595090555513
lightning current arrester for two 2-core telecommunication and signalling lines, installation at the entry into building, max. 180 V, pluggable...
Ordering number:
8595090555551
lightning current arrester for two 2-core telecommunication and signalling lines, installation at the entry into building, max. 180 V, pluggable...
Ordering number:
8595090564676
lightning current arrester with coarse and fine surge protection for up to 4-core shielding floating signalling lines, installation at the line entry...
Ordering number:
8595090564683
lightning current arrester with coarse and fine surge protection for up to 4-core floating signalling lines, installation at the line entry into...
Ordering number:
8595090564690
lightning current arrester with coarse and fine surge protection for 2-core shielding floating signalling lines, installation at the line entry into...
Ordering number:
8595090564706
lightning current arrester with coarse and fine surge protection for 2-core floating signalling lines, installation at the line entry into building...
Ordering number:
8595090564720
lightning current arrester with coarse and fine surge protection for two 2-core shielding floating signalling lines, installation at the line entry...
Ordering number:
8595090564737
lightning current arrester with coarse and fine surge protection for two 2-core signalling lines, installation at the line entry into building and...

Pages